Document - Badger Rapide Croche Hydroelectric Project, Project No. 2677 Scoping Comments

Abstract

American Whitewater requests that the Commission direct the applicant to provide additional information that will enable a more complete review of this project and its impacts. Specifically, information on existing river-based recreation needs to be provided, impacts of the project and proposed future operations on instream recreation must be quantified, a quantitative evaluation of instream flow needs for recreation must be provided, and recreational mitigation measures with a direct nexus to project impacts must be fully considered and evaluated.

Description

AW's Scoping Comments on the proposal to expand generation capacity and divert additional water from the Fox River, WI.

Document Information

Filename - Badger Rapide Croche Hydroelectric Project, Project No. 2677 Scoping Comments556.pdf

Size - 853.68KB

Download Document
Join AW and support river stewardship nationwide!